MINUTES OF MEETING

NORTH SPRINGS IMPROVEMENT DISTRICT

 

            The regular meeting of the Board of Supervisors of the North Springs Improvement District was held on Thursday, June 8, 2006 at 4:30 p.m. at the District Office, 10300 N.W. 11th Manor, Coral Springs, Florida.

 

            Present and constituting a quorum were:

 

            Salvatore Mendolia                                           President

            Steve Mendelson                                              Secretary

 

            Also present were:

 

            John Petty                                                        Manager

            Dennis Lyles                                                     Attorney

            Jane Early                                                         Engineer

            John McKune                                                   CH2M Hill

            Jean M. Rugg                                                   Severn Trent Services

            Brenda Schurz                                                  Severn Trent Services

            Janice Larned                                                   Severn Trent Services

            Tara Lynn-Patton                                             WCI Communities, Inc.

            Mike Hessler                                                    WCI Communities, Inc.

                                                                                   

FIRST ORDER OF BUSINESS                               Roll Call

            Mr. Mendolia called the meeting to order and Mr. Petty called the roll.

 

SECOND ORDER OF BUSINESS                          Approval of the Minutes of the May 10, 2006 Meeting

            Mr. Petty stated each Board member received a copy of the minutes of the May 10, 2006 meeting and requested any corrections, additions or deletions.

            There not being any,

 

On MOTION by Mr. Mendolia seconded by Mr. Mendelson with all in favor the minutes of the May 10, 2006 meeting were approved.

 

THIRD ORDER OF BUSINESS                             Consideration of Permit Requests

            A.     Parkland Village Lake Excavation

            Ms. Early stated this is a simple surface water permit for the construction of lakes.  It meets all requirements.

            Mr. Petty asked has there been any change to the surface area?

            Ms. Early responded no.  They meet the required acreage.

            Mr. Mendolia asked who is paying for this?

            Ms. Early responded it will be by funding agreement, which you will see under award of contracts.  There will be a District bond issued.

            Mr. Petty stated it will be part of our system. 

           

On MOTION by Mr. Mendolia seconded by Mr. Mendelson with all in favor the permit request for the Parkland Village Lake Excavation was approved.

           

            B.     Wal-Mart Store #4498-00 Winn-Dixie Takeover

            Ms. Early stated the Winn-Dixie on the northwest corner of Wiles Road and University Drive is being taken over by Wal-Mart.  They will be making minor structural modifications, which will impact the layout they submitted for a surface water permit.  They wanted to make sure the existing drainage system is compliant and meets all criteria, which it does.

            Mr. Mendolia asked are they going to open a Super Wal-Mart?

            Ms. Early responded no.  I do not believe so.

            Mr. Mendolia asked do you know if it is strictly food?

            Mr. Petty stated from what I understand from the business review it is strictly food.

           

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor the permit request for the Wal-Mart Store #4498-00 Winn-Dixie takeover was approved.

 

FOURTH ORDER OF BUSINESS                          Consideration of Award of Contract and Associated Agreements

            A.     Parkland Village Drainageways

                     i.       Award of Contract

                     ii.      Work Authorization #160

                     iii.     Funding Agreements #449 and #450

            Ms. Early stated on May 18, 2006 we received bids for the Parkland Village drainageways.  We only received one responsive bid, which was submitted by Triple R. Paving, Inc.  The amount of the bid is $2,199,999.  It includes things, which are not the District’s.  It includes parts of Parkland as well.  There are two funding agreements, which go with it.  One is for the lake excavation, which is the District’s. 

            Mr. Mendelson asked who is going to be paying for part of it?

            Mr. Petty responded the District will take on a certain amount and the rest will be borne by the developer at their expense and risk.  If we have excess funds at a later date, there is a back way for us to pay it. 

            The funding agreement is for $873,372 and it is for the lake portion.  There is a funding agreement for water and sewer.  We are putting a small piece of water and sewer.  We have to put a culvert and a bit of the infrastructure.  This funding agreement amounts to $40,400.  Everything else will be paid by the property owner, which is Tousa Homes. 

            Mr. Petty asked under these types of agreements where we are funding less than half of the total amount, are we still in control of the contract?

            Ms. Early responded I do all of the pay estimates and review everything, which comes in. 

            Mr. Petty asked how much of the project will be turned over to the District?  Will we be obtaining facilities through grants?

            Ms. Early responded the lake was dedicated to the District by plats and then the water and sewer portion. 

            Mr. Mendolia asked is what we just broke down within this number of $2,199,999?

            Ms. Early responded yes.

            Mr. Mendolia asked why is it under Triple R. Paving, Inc.?

            Ms. Early responded that is how much they bid.  Of this amount, the portion of the lake excavation, which is the District’s, will be $873,372.  The water and sewer, which will be along NSID is $40,400.  This is within the Triple R. Paving, Inc. bid.  The remaining amount will be paid by Tousa Homes.  When I get a pay estimate, I split it and tell everyone who pays what.  We will prepare the requisitions for the funding agreements.  At some point when the bond is sold, the District’s portion will come out of the bond. 

            Mr. Mendolia asked can you break down what you said on this paperwork?

            Mr. Early responded yes.  If you look at items eight, nine and ten, it amounts to the water and sewer.  The portion of the bond I break down by percentage.  Item one, three, five, six and seven are for the NSID lake portion, which will be paid out of the bond issue.  The District is going to pay for de-mucking the lake area, digging the lake and putting in the culvert. 

            Mr. Mendolia asked is this within the number of $2,199,999?

            Ms. Early responded yes.

            Mr. Mendolia asked why can we not break it up by what goes to Triple R. Paving, Inc.?

            Ms. Early responded it all goes to Triple R. Paving, Inc.  Triple R. Paving, Inc. is the only contractor and this is his bid for the entire job.  We only received one bid.

            Mr. Mendolia stated that was my other question.

            Ms. Early stated we cannot get any bidders.  We faxed it.  We advertised it for a month in the paper two times.  We did not get any bidders.  I have another job I did not receive any bidders for.

            Mr. Petty stated it is convoluted and your concerns are our concerns.  We were talking with the engineer so these types of agreements are presented to the Board in a more easily digestive format in the future.  We know we have these basic agreements and responsibilities.  We are looking to see as they come in if we are filling up, if we reached our end cap, when is the new one and the old one going away.  We are talking about having the status on each project.  We hope this will help answer many of these questions.  As for the availability of contractors we are doing okay.  I am glad we have a competent one out there.  It is hard to find good people.

            Ms. Early stated he has all of his equipment out there.  The funding agreements have a breakdown showing who is paying for what.

           

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor the award of contract for the Parkland Village drainageways to Triple R. Paving, Inc. in the amount of $2,199,999, Work Authorization #160 and Funding Agreements #449 and #450 were approved.

 

            B.     Heron Bay North Plat 1 Phase II

                     i.       Award of Contract

                     ii.      Work Authorization #162

                     iii.     Funding Agreement #452

            This is for Phase II of Cypress Pointe.  We already have Cypress Pointe Phase I done.  We only received one bid and it is from Florida Sewer and Water, Inc. in the amount of $1,489,994.35.  This requires a funding agreement with WCI Communities, Inc.  The amount of the funding agreement is for $340,349.50.  WCI Communities will pay for all of the paving and drainage.  The District is responsible for D, E and F, which totals $340,349.50.

            Mr. Mendolia asked are there any problems with this?

            Ms. Early responded we only got one bid. 

            Mr. Petty stated it is close to the engineer’s estimate.

            Ms. Early stated it is also close to what they have been bidding.

            Mr. Mendelson asked is it within the range you were looking for?

            Ms. Early responded that is correct.

 

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor the award of contract for Heron Bay North Plat 1 Phase II to Florida Sewer and Water, Inc in the amount of $1,489,994.35, Work Authorization #162 and Funding Agreement #452 were approved.

 

            C.     Pine Island Road Extension

                     i.       Award of Contract

                     ii.      Work Authorizations #163 and #164

                     iii.     Funding Agreement #451

            Ms. Early stated the funding agreements should be #451 and #453.  We also received only one bid from Triple R. Paving, Inc. in the amount of $1,816,153.92.  A portion of this project is being paid out of the new bond for Parkland Golf and Country Club and Supplement 3.  There are two funding agreements we need.  There are two turn lanes, which will be going into Parkland Village off of Pine Island Road.  It is Tousa Homes.  They have to fund two turn lanes.  When they sell their bonds, it will pay for the turn lanes.  One funding agreement is for $60,000 with Tousa Homes for the turning lanes.  There is a water main, which goes up Pine Island Road as well.  The amount of this funding agreement is for $132,873.80 with WCI Communities, Inc. to fund the water and sewer portion.  The rest of the job is paid out of the two existing bond issues. 

 

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor the award of contract to Triple R. Paving, Inc. for the Pine Island Road extension in the amount of $1,816,153.92, Work Authorizations #163 and #164, and Funding Agreements #451 and #453.

 

FIFTH ORDER OF BUSINESS                               Consideration of Change Orders

            A.        Change Order No. 4 – Triple R. Paving, Inc. for Nob Hill Road, University Drive (Phase 2) and County Line Road for a Net Increase of $24,735

            Ms. Early stated this job was completed and filed.  Going through the paperwork we could not find when this particular change order came before the Board.  This is a follow up to get it approved by the Board.  The change order was paid for by WCI Communities, Inc. 

            Mr. Petty asked does this mean it is a housekeeping issue?

            Ms. Early responded that is correct.

 

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor Change Order No. 4 with Triple R. Paving, Inc. for Nob Hill Road, University Drive (Phase 2) and County Line Road for a Net Increase of $24,735 was approved. 

 

            B.        Change Order No. 4 & Final – Florida Sewer and Water, Inc. for Heron Bay Northeast “Greenbrier” for a Net Decrease of $41,561.77

            Ms. Early stated this is a final balance change order.  The project is complete.  It is to finalize the quantities adjusted to the as-builts.  At the end you will see there is a decrease to WCI Communities, Inc. in the amount of $17,065.77 as well as a decrease to the NSID contract in the amount of $24,496.

 

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor Change Order No. 4 and Final with Florida Sewer and Water, Inc. for Heron Bay Northeast “Greenbrier” for a net decrease of $41,561.77 was approved.

 

SIXTH ORDER OF BUSINESS                              Staff Reports

            A.        Manager’s Report – Distribution of Proposed Budget for Fiscal Year 2007 and Consideration of Resolution 2006-5 Approving the Proposed Budget and Setting a Public Hearing

            Mr. Petty stated a copy of the proposed budget was distributed.  There are some on the back table for any audience members who wish to look at it.  We do this in order to disseminate to the public for their input as well as to local government for their review.  This is a proposed budget and it is not adopting anything final.  It is coming from your manager based on projects the manager and engineer wish to bring before the Board or items the Board has asked for during the last fiscal year.  We ask you to approve this so we can send it out, discuss it at future meetings and set a public hearing where we can adopt a final budget.  We will send it to the property appraiser to set the assessments.  I would like to go over some items and tell you why we changed the numbers.

            The third page, which is actually page one, is a line item break down of the general fund.  You will see salaries went from $42,687 to zero.  This is because of a change from our sister district, CSID.  We are modifying the way we are applying the personnel share.  CSID will be responsible for all of the employee costs and will work with NSID in the same manner.  It will do so through ownership of the employee and will part it out to us for our benefit at the same rate as before.  We will do it through Interlocal Agreements from Mr. Lyles’ office.

            The costs are not reflective of any increase other than the cost of living with one exception.  The retirement program is being amended to change from a contribution to an IRA type benefit to one with the State of Florida. 

            Mr. Mendolia asked is it a 401K?

            Mr. Petty responded no sir.  This is a participation in the State of Florida pension program, which we find to be competitive with what we have.  We feel it will help us maintain what is becoming a shallow pool of people.  It will be competitive with our other utilities.  As you can see the special pay and FICA are zeroed out.  You will only have a single line item in your budget to be concerned with.  Management fees are the same as last year.  There is a special assessment consultant fee.  It is a one time fee of $5,000.  It is because we feel we might need to call Ms. Mossing and get information from her so we do not stumble in this first year of us doing this in her absence. 

            The next item going up a bit is technology sharing.  This is not a new item.  You were sharing this with CSID through Severn Trent Services.  This is for the main frame computer system, the software running your utility billing program and your human resources system.  This system is approximately eight years old.  It is time to rebuild it.  CSID will be doing it at a cost of approximately $250,000.  We are putting it in a singular line item so you can monitor it. 

            Electronic storage document is a new line item.  We estimated it at $5,000.  It will be provided by Severn Trent.  We started this process.  You have a large stack of blue prints.  You can see the documents we handle financially.  These are all paper documents we do not store electronically.  Our concern is we cannot wait to do this because of the hurricanes.  It is time to store these electronically.  We brought in a large system to handle the blue prints.  We have a new copy machine at CSID, which will convert all copied documents to and electronic format.  CSID is building a storage system with redundancy back up so we have access to these files.  In the case of an emergency, they will be leaving the site. 

            The next item is transaction overlay in the amount of $5,000.  This refers to our shared cost with CSID.  We just completed a special audit of the accounting functions of the District to share.  It is Ms. Walker’s office, our management service and how we interact with our equipment.  We came through in a good report.  The weak spot is there are single entities responsible for 99% of the accounting functions.  If something should happen to Ms. Walker, we will be in trouble.  This is a secondary system so all actions hitting the accounting function are written down in a transaction style journal so it can be rebuilt at anytime by anyone.  We call it a double entry overlay. 

            The next item I want to talk to you about is building rent.  It has maintained its current position.  We feel it will probably go up in future budgets because it has not changed in 15 years.  It is for the space we rent in this building.  The point I am trying to make is CSID has been a good neighbor and partner. 

            Other current charges were $1,500 in the past.  We cannot have millions of dollars sitting there in case of an emergency.  We have to figure out in our budgeting whether or not it is accurate and to what degree.  Other fees and charges are contingencies.  This budget is plus or minus five percent.  Instead of being at $1,200 for miscellaneous fees and charges, I would like you to consider five percent as a more accurate way of trying to anticipate the fees and charges we do not anticipate during the budget process.  We will look in other areas of the budget to hold the reserve more closely to a number more reflective of an immediate cost for a financial position, which will carry us to the issuance of a note.  It is something we need to get through the first 30 days. 

            If you go to field operations, salary and wages is your field crew.  Because of the expansion of the District, we have more lakes and canals to maintain.  The increase is for a new crew to begin addressing it.  Pension expenses are similar.  Keep in mind we are converting from an IRA style to a Florida pension, which gives us a competitive advantage over the other utility and water management facilities. 

            Mr. Mendolia asked what about health insurance?

            Mr. Petty responded our staff is getting older.  Young people in this community will be harder to come by as the cost of housing increases.  The next item, which went up is electric due to additional flows we will be pumping from additional lakes and canals.  Insurance is a relatively small increase based on the rumors flowing after Hurricane Wilma on what is to be expected of increases.  Even though it is an increase, we are doing okay. 

            We have a new item called aquascaping.  This is for plants we are required to plant within our lake system.  They are used in littoral zones.  It is mandated in quite a few areas.  This is a dollar amount, which goes in for plants destroyed by things like heavy winds, chemicals entering the water supply by accident and those dying from other natural conditions.  We have seen plant material die off and we are now in a position where we need to spend money to replenish the area. 

            Project management contract was for Mr. Moore in the past.  We filled the position with either onsite personnel or my contract administration from here.  I am familiar with operations to this degree.  The next thing is other current charges, which is our contingencies.  We are considering the accuracy of the budget and we would like to recommend five percent plus or minus.  This means you will finance five percent of the operations. 

            Dues, licenses and subscriptions are for our aquatic guys to maintain various licenses they need to get in order to spray with aquatic chemicals.  In the past we used a contractor for littoral plantings.  It is intended with this new crew they not only be the typical boat applicator in a canal, but to also go to the next level of applicator.  This way they will be able to handle the mitigation areas as well as plantings and specialized applications on a wetland environment.  We can save money by having this be in house. 

            Capital outlay is an estimate from accounting, which is basically between last year and the year before, based on expectations.  The reserves are at a similar level as last year and you will see details in the budget.  This is from what the Board discussed in previous years as to what is a level of assurance for certain equipment and machinery.  We want to have funds available if they fail to work.

            Those were the changes I wanted to speak to you about.  On page five I want to point out management fees.  We will discuss this further when we talk about the water and sewer budget.  The presentation from Severn Trent Services is for your management finance and the recording secretary duties we give you as well as a great deal of new items we discussed today such as document management and overlays.  Ms. Larned’s expertise in finance is a welcomed addition to the team and is being provided to NSID.  Ms. Rugg is extremely reliable and we are grateful she is with us.  Hopefully I have shown there is a new found commitment to the management responsibilities for the District.  It is our intent to resell to you our services and for you to know exactly what we are providing. 

            Unless there are additional questions, the rest of this is a work in progress with definitions coming in over time.  The rest is in line with what we did in the past.  We have been in contact with some of the sub-parts of the general fund.  We talked with the Parkland Isles Landscaping Committee and discussed what they want their expenses to be.  We have a nice number they are familiar with in our proposed budget.  We will be working with them on their estimates as we go through better definitions with the landscaper.  We will put in actual numbers when they get estimates. 

            WCI Communities, Inc. has been good at presenting and discussing their numbers.  What we have in the proposed budget is what we gave them as a maximum box they have to fit into.  We took last years assessments and increased them by 30%.  We are 99% done with the agreement.  Mr. Lyles has been working directly with their attorney.  The only thing I have to go through is the transition document, which needs to be attached for fixed assets.  Under the new policy, WCI Communities, Inc. will operate this facility and we will give them 1/12 of whatever the single line item was for the operation.  Their task is to keep residents happy in a recreational facility we supply.  We have some additional costs in the budget.  On page 19 you have the details. 

            I will refer you to the top where you have management contract.  You will see under the proposed budget many numbers have been pushed up to the management contract.  This is not the proposed number from WCI Communities, Inc.  It is the cap we feel can be considered.  They have to fit within this.  They look to us to give them guidance in this matter.  They are doing very well.  Under this contract the District will hold them responsible for satisfaction to the residents.  If the residents are unhappy with the managers of the facility, they can ask us to fire them.  We will consider it if we have enough residents complaining.

            Mr. Mendolia asked what about the subject of additional tennis courts?

            Mr. Petty responded there are funds available in our construction account, which the District may be able to utilize to construct additional tennis courts.  It appears as many as six courts can fit on the existing property available.  We can get more courts if we modify the end of The Commons, which touches our swale.  It appears we can have a nice program and we will bring it to you before we adopt the final budget. 

            Mr. Mendolia asked how long?

            Mr. Petty responded we will probably be ready at the next meeting. 

            Mr. Mendolia asked will it be finalized?

            Mr. Petty responded no sir.  We will have a proposal to give you for the budget. 

            Mr. Mendolia asked the subject is how many courts will there be?  How are they going to do it?  Do they have a layout or survey?

            Mr. Petty responded we are working on it as we speak. 

            Mr. Mendolia stated this has to move on.  We have been talking about this for a few months. 

            Mr. Petty stated I will be glad to expedite. 

            Mr. Mendolia asked where are the Board’s figures?

            Mr. Petty responded on page one. 

            Mr. Mendolia stated I believe it is time to consider an increased fee for the Board.

            Mr. Petty stated there is a process to follow for such consideration.  Mr. Lyles is familiar with this process and it will be his office, which will guide us through it.  I see no reason why we cannot consider this during the budget process. 

            Mr. Lyles stated we cannot consider it during the budget process because it is capped by the special act establishing the District.  The law will supersede any internal processes the Board and staff will want to pursue.  We will be required to seek an amendment to the special act, which authorizes the District to operate and gives it its powers.  What we can do is going to require us to go into next year’s legislative session.  We can prepare a special bill, file it with the Broward County Delegation Legislation, take it to Tallahassee and see if we can get it through the process. 

            We can also address the bidding threshold as well as the compensation reimbursement for the Board.  I do not know how it will be received.  I cannot predict you will receive a positive reception.  It is very easy for elected officials to say, “No.  We are going to hold the line on these expenses.  We are not going to approve it.”  They may say yes because it has been the same fee for the past 30 years and it is time for it to be adjusted.  It will require lobbying and effort on your part as President to justify this matter.  You may want to enlist the service of a lobbyist to help with this change as well as other changes to benefit the District.  You might want to see if CSID wants to share the cost.  They have some of the same problems you do.  It is a way of doing it in a more efficient and less expensive way. 

            The management and efficiency study committee the Broward County Commission sets up was looking into special districts and water drainage districts all over the county.  Their preliminary draft report has come out.  As far as I know it is not final.  The report, which will go to the commission, makes a recommendation that the Board members of special districts be elected in the same fashion and at the same time as city and county officials and no longer in landowner elections.  The county may or may not want to pursue this.  If the county does pursue this, it will require a special amendment to your special act.  If they do want to pursue this next year, it will be the time to piggy back into a process with the adjustment to the reimbursement to the Board members.  I feel the staff should take your request and direction to proceed to find the best way to implement it as things shape up in the coming months. 

            Mr. Petty stated staff has a long list of items we would like to address on our establishing document.  We would like to update and modernize many things.  The election issue is one we need to begin discussing.  I have no personal opinion on it.  We have a large amount of landowners in NSID we should talk to see if they have any concerns before we volunteer ourselves to this program.  I do not believe there will be a problem.  We are an urban area and it is intended by current legislation that this is how a special district should evolve.  I want to make sure we consult with our major landowners to make sure they do not have any concerns.  It is time we do this.  For budgeting purposes, we can put a line item in under administration with a dollar value. 

            Mr. Lyles stated it is beyond any process we can adopt at the District level.  It is controlled by state legislature.  We have to go to them if we want to have an amendment. 

            Mr. Petty stated if we are successful, this change may become effective October of next year. 

            Mr. Mendolia stated it is good for future Supervisors to push it and process it.

            Mr. Lyles stated staff will take this as direction and we will pursue it.  Do you have a figure you want to suggest to the Board in order to budget it?

            Mr. Petty responded let me check with the current lobbyist the District is using.

            Mr. Lyles stated I am talking about the line item you will have in case the legislature approves the increase. 

            Mr. Petty stated we can pick it up with our five percent.  Resolution 2006-5 is “a resolution of the Board of Supervisors of the North Springs Improvement District approving the budget for fiscal year 2007 and setting a public hearing thereon pursuant to Florida Law.”  The public hearing will be held on August 9, 2006 at 4:30 p.m. in this office. 

 

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor Resolution 2006-5 approving the proposed budget and setting a public hearing on August 9, 2006 at 4:30 p.m. in the District Office was adopted. 

 

            B.        Attorney’s Report

            There being no report, the next item followed.

 

            C.        Engineer’s Report – Consideration of Rate Increase

            Mr. Petty stated we have consideration of a rate increase which was submitted by CH2M Hill.  We have looked at the fees and they are not out of line with what other corporate engineering firms are charging.  In reference to Ms. Early and Mr. McKune, their value is beyond measure.  We ask you to consider this.

            Mr. Mendolia stated I agree with you.  They are fantastic and I depend a great deal on them.

On MOTION by Mr. Mendolia seconded by Mr. Mendelson with all in favor the rate increase submitted by CH2M Hill was approved.

 

SEVENTH ORDER OF BUSINESS                        Approval of Requisitions and Invoices

            Mr. Petty stated in the future we hope to add to this a break down by projects.

            Mr. Mendolia asked what are these refunds to WCI Communities, Inc.?

            Mr. Petty responded I want to make sure I look at them before I spit anything out.  As we are doing final change orders for these contracts there are lower numbers.  The checks come to us and I believe we give them their shares.  You have some water and sewer bills in your general fund.

            Mr. Mendolia asked are these the deposits being refunded?

            Mr. Petty responded they are either getting their deposits back, which is a refund because they are moving or it is a correction because we read their meter wrong.

 

On MOTION by Mr. Mendelson seconded by Mr. Mendolia with all in favor the requisitions and invoices were approved.

 

EIGHTH ORDER OF BUSINESS                           Supervisor’s Request and Audience Comments

            There not being any, the next item followed.

 

NINTH ORDER OF BUSINESS                             Adjournment

            There being no further business,

 

On MOTION by Mr. Mendolia seconded by Mr. Mendelson with all in favor the meeting was adjourned at 5:30 p.m.

 

 

 

                                                                        

 Jean M. Rugg                                                                  Salvatore J. Mendolia

 Assistant Secretary                                                          President